WhatsMiner M72

  • Brand MicroBT
  • Hashrate 246-282 Th
  • Algorithm SHA-256
  • Efficiency 14.5 j/Th
  • Release date December 2025
  • Cooling Air

Calculation for 282Th

Profit per day
10.96 USDT

≈ 916.60 ₽

Payback
d.
  • Power 4089 W
  • Ads count 9
  • The best price 585698 RUB

WhatsMiner M72S

  • Brand MicroBT
  • Hashrate 264-300 Th
  • Algorithm SHA-256
  • Efficiency 13.5 j/Th
  • Release date December 2025
  • Cooling Air

Calculation for 300Th

Profit per day
11.66 USDT

≈ 975.10 ₽

Payback
d.
  • Power 4050 W
  • Ads count 7
  • The best price 304000 RUB

Conclusion

In the MicroBT lineup, models WhatsMiner M72 and WhatsMiner M72S occupy different niches despite their similar origin. The unified algorithm (SHA-256) allows switching between coins (Bitcoin, Fractal Bitcoin, Bitcoin Cash, BitcoinSV, Terracoin, Namecoin) on both ASICs, but maximum profit is currently achieved when mining Bitcoin, Fractal Bitcoin. The WhatsMiner M72 device from MicroBT is available in a wide range of powers. Versions from 246Th to 282Th are available. Choose the right WhatsMiner M72S version for your needs from 19 options with power ranging from 264Th to 300Th inclusive. The difference in 18 Th shows the advantage of one model, but it's also worth paying attention to the efficiency of the models. Model WhatsMiner M72 has an efficiency of 14.5 j/Th and WhatsMiner M72S has 13.5 j/Th. The power consumption of MicroBT WhatsMiner M72 282Th is 4089 Watts. MicroBT WhatsMiner M72S 300Th, in turn, consumes 4050 Watts. The cooling type for both models is identical — classic fan airflow. 9 ads found for MicroBT WhatsMiner M72. The current cost for 246Th power is from 224000 RUB. Both new and used devices are available. 7 active listings available for MicroBT WhatsMiner M72S. The best price-to-performance ratio: 264Th for 241000 RUB.

Offers

WhatsMiner M72S 296Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
300000 RUB
Moscow
WhatsMiner M72S 272Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
248000 RUB
Moscow
WhatsMiner M72 262Th
R7miner

Trust Factor

R7miner company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 60
Price on request
Moscow
WhatsMiner M72 262Th
Sibmain

Trust Factor

Sibmain company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
Price on request
Moscow
WhatsMiner M72S 288Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
292000 RUB
Moscow
WhatsMiner M72S 280Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
255000 RUB
Moscow
WhatsMiner M72 282Th
GIS mining

Trust Factor

GIS mining company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
The price includes VAT
585698 RUB
Moscow
WhatsMiner M72 254Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
253000 RUB
Moscow
WhatsMiner M72S 282Th
Sibmain

Trust Factor

Sibmain company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
Price on request
Moscow
WhatsMiner M72 278Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
277000 RUB
Moscow
WhatsMiner M72 262Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
261000 RUB
Moscow
WhatsMiner M72S 264Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
241000 RUB
Moscow
WhatsMiner M72S 300Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
304000 RUB
Moscow
WhatsMiner M72 262Th
GIS mining

Trust Factor

GIS mining company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
The price includes VAT
487411 RUB
Moscow
WhatsMiner M72 270Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
269000 RUB
Moscow
WhatsMiner M72 246Th
Майнинг Кластер

Trust Factor

Майнинг Кластер company has a high trust level
  • Condition New
  • Availability Preorder
  • Waiting (days) 30
224000 RUB
Moscow