Antminer S23 Hyd
- Brand Bitmain
- Hashrate 563-580 Th
- Algorithm SHA-256
- Efficiency 9.5 j/Th
- Release date January 2026
- Cooling Hydro
Calculation for 580Th
≈ 1,927.73 ₽
- Power 5510 W
- Ads count 12
- The best price 1000000 RUB
Rig
- Brand Proto
- Hashrate 819Th
- Algorithm SHA-256
- Efficiency 14.652 j/Th
- Release date September 2025
- Cooling Air
Calculation for 819Th
≈ 2,722.09 ₽
- Power 11999.988 W
Conclusion
The choice between Bitmain Antminer S23 Hyd and Proto Rig is a classic dilemma for mining investors. The unified algorithm (SHA-256) allows switching between coins (Bitcoin Cash, Bitcoin, Fractal Bitcoin, BitcoinSV, Terracoin, Namecoin) on both ASICs, but maximum profit is currently achieved when mining Bitcoin Cash. Bitmain Antminer S23 Hyd has several versions, with hashrate starting from 563Th and going up to 580Th. The Rig device has a single available configuration — 819Th The difference in 239 Th shows the advantage of one model, but it's also worth paying attention to the efficiency of the models. Model Antminer S23 Hyd has an efficiency of 9.5 j/Th and Rig has 14.652 j/Th. The power consumption of Bitmain Antminer S23 Hyd 580Th is 5510 Watts. Proto Rig 819Th, in turn, consumes 11999.988 Watts. Miner Antminer S23 Hyd (Hydro) will significantly differ in noise level from Rig (Air). Our platform has 12 offers of Bitmain Antminer S23 Hyd from different companies, available both in stock and on order. The best price for the 580Th version is currently 1000000 RUB. Offers for Proto Rig are temporarily unavailable, but our catalog contains many other profitable models.
Offers
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Crypto One company has a high trust level- Condition New
- Availability In stock
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Intelion Data Systems company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25