Antminer L11
- Brand Bitmain
- Hashrate 20Gh
- Algorithm Scrypt
- Efficiency 184 j/Gh
- Release date September 2025
- Cooling Air
Calculation for 20Gh
≈ 975.78 ₽
- Power 3680 W
- Ads count 21
- The best price 356890 RUB
WhatsMiner M72S
- Brand MicroBT
- Hashrate 264-300 Th
- Algorithm SHA-256
- Efficiency 13.5 j/Th
- Release date December 2025
- Cooling Air
Calculation for 300Th
≈ 991.90 ₽
- Power 4050 W
- Ads count 7
- The best price 304000 RUB
Conclusion
The choice between Bitmain Antminer L11 and MicroBT WhatsMiner M72S is a classic dilemma for mining investors. Antminer L11 and WhatsMiner M72S cannot be directly compared by hashrate as they operate on different protocols: Scrypt and SHA-256 respectively. Model Bitmain Antminer L11 is presented exclusively in a configuration with 20Gh, other power options are not provided for this series. Choose the right WhatsMiner M72S version for your needs from 19 options with power ranging from 264Th to 300Th inclusive. The power consumption of Bitmain Antminer L11 20Gh is 3680 Watts. MicroBT WhatsMiner M72S 300Th, in turn, consumes 4050 Watts. The cooling type for both models is identical — classic fan airflow. 21 ads found for Bitmain Antminer L11. The current cost for 20Gh power is from 356890 RUB. Both new and used devices are available. 7 active listings available for MicroBT WhatsMiner M72S. The best price-to-performance ratio: 264Th for 241000 RUB.
Offers
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Mining Depot company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability In stock
Trust Factor
IBMM Technology company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Динтег (Векус майнинг) company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 25
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Арсенал Юг company has a low trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Intelion Data Systems company has a medium trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
MinerGroup company has a medium trust level- Condition Used
- Availability In stock
- Warranty (months) 4
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
TCS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
Майнинг Кластер company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30
Trust Factor
GIS mining company has a high trust level- Condition New
- Availability Preorder
- Waiting (days) 30